● Meeting hall construction update as of May 5, 2012

1. Ceiling tiles in the main sanctuary are completely installed.
2. Second floor classrooms are being carpeted. Carpet for the main sanctuary and vinyl boards for the
    dining hall will begin when moisture content in the concrete is lowered to acceptable levels.
3. Tile-laying at the central lobby began on Friday.
4. Washroom toilet partitions will be installed last, after all plumbing fixtures are done.
5. Steel doors and wooden doors throughout the building are being installed.
6. The canopy at the front lobby will be fitted with glass over the rafters.
7. Installation of irrigation pipes and sprinkler system for grass areas began on Wednesday.
8. Kitchen counter tops, sinks, and faucets have been installed.
9. All the duct works for ventilation have been completed.
10. Installing of T-bar ceiling and ceiling tiles will be finished this week.
11. Progress billing for $394K is due for payment on May 15, 2012.
12. The Lord provides suitable temperature and weather for the exterior painting to be done next 
      week.

Offering for the meeting hall construction (as of April 29, 2012)


Offering Goal
Current Accumulated Offerings
($1.35 M Loan from LM churches)

Current Disbursement
Current Balance
($1.35M Loan from LM churches)
$4,500,000
$3,478,197 /
$4,828,197
Project Fund
Security Deposit
Total Expenditure
$754,279 /
$595,721
$4,022,476
$210,000
$4,232,476
Percentage of our Goal Achieved at present
Current Deficit
77.29%
$1,021,803