● Attached are more photos of the meeting hall during the second week of May

Two works install concrete capping on the plant box on the north side of the building.

 Workers installs irrigation pipes for watering trees and grass.

Details of the north side of the building around the central entrance.

Tile installers use machines to cut tiles to the right size for fitting into the floor pattern.


 Four workers install glass on the aluminum frames to form the canopy at the front entrance.

Worker cuts the aluminum soft-fit sections to the right length to install above the inset ceiling at the lobby entrance.

New concrete has just been poured on the two ramps leading to both the central and front entrances.

Another view of the ramps

View from the sidewalk shows the new concrete aggregate floor finish at the front end of the walkway and entrance steps.

Men and machine work together to plant a tree beside the driveway, one of the several already planted around the building.

Men and machine work together to plant a tree beside the driveway, one of the several already planted around the building.
Men and machine work together to plant a tree beside the driveway, one of the several already planted around the building.



No comments:

Post a Comment