● Meeting Hall Construction Update as of July 17, 2011





1. On July 11, we signed the contract with the construction company to do the offsite sewer construction works.
2. Based on the cooling load expected for conferences when our meeting hall will be filled to capacity, we have decided to install two airconditioning units of 20 tons each. This system will increase our cost by about $54,000, but provides the most stages of cooling for best part load performance, adequately covers all cooling load demands, requires no changes to the ceiling depth, and has backup capability in case either unit fails.
3. Praise the Lord! As of Friday, July 15, the registration of our servicing agreement has been confirmed by the Land Title Office (LTO). As a result, our church project will be included in the agenda of the Council meeting on July 25. This will conclude the entire application for building permit.
  会所盖建最新消息                                          
   

  1. 7/11日,我们将下水道工程发包给建筑公司并签订合约。
  2. 空调设备我们最后议定安装两个系统(每个单位为20吨),这个项目增加成本约54,000元,但其功能及负荷的承受量,均能符合我们的最高要求。
  3.  我们的服务协议送交LTO(土地所有权办公室)已於7月15日完成登记,并且我们的建筑申请可于市议会7/25日的议程中被审理, 我们整个申请程序至此便全部完成。
                      新会所盖建奉献情形(至2011710日止)
奉献目标
实际收入
实际支出
馀额
$ 4,500,000
$ 2,298,731
$ 1,122,364
$ 1,176,367
目标达成率
尚缺金额
51.08 %
$ 2,201,269