Thursday, September 29, 2011

● Meeting Hall Construction Update as of September 23, 2011


 This picture, taken on September 19, shows the forms still being installed for the low walls on the north side of the building, in preparation for concrete pouring.



Taken on September 23, this shows the concrete walls after the forms were removed.

No comments:

Post a Comment